Altadena ADU Solutions

California State Approved Factory Built Prefab Homes

Rebuilding Altadena After the Eaton Fire

In the wake of the devastating Eaton fire, our community needs resilient, fire-rated housing solutions more than ever. 

Industrial Hygienist site soils testing report for Asbestos and Heavy Metals of site

Grading & Soils Compaction required for the location of the unit(s)

Removal of stumps, roots, remnant footings for the location of the unit(s)

Soils Compaction report for the location of the unit(s).

Supporting Altadena's Recovery

Whether you're rebuilding your primary residence or adding temporary housing for displaced family members, our turnkey ADU solutions provide a safe, fire-resistant option. We're here to help Altadena rebuild stronger and safer.

MODEL: WINNIE 33

Floor Plan: 12' x 33'

Size: 408 Sq.Ft

Configuration: 1 Bedroom, 1 Bathroom

Starting at $195,000**

Turnkey Prefab ADU Pricing for Altadena

What's Included

Structure & Exterior

✓ California State Pre-Approved Architectural & Structural Plans

✓ Metal Roof – Fire Rated

✓ Structurally Insulated Panels (SIPs) Construction w/Steel Framing

✓ Steel Framed Floor Perimeter

✓ Cement Fiber Board Hardie Exterior Siding – Fire Rated

✓ 2 Skylights

Interior Finishes

✓ Shaker Style White Cabinets w/ Birch veneer interior, w/ slow close hardware

✓ Designer Stacked White Kitchen Back Splash Tile

✓ Luxury Waterproof Laminate Flooring

✓ Shaker Style White Custom Bedroom Closet System w/ Mirror

✓ Designer Stacked White Shower Tile Surround

✓ Smooth Interior Wall Finish – Level 4

Windows, Fixtures & Finishes

✓ Milgard Black Interior/Exterior Vinyl Windows

✓ Shower Glass Enclosure with Black Trim

✓ Exterior Light Fixtures

✓ Black Delta Plumbing Finishes

✓ Quartz Counter Tops

✓ Interior Recessed Ceiling Lights

Systems & Utilities

✓ MiniSplit Heating and Cooling Units

✓ Plumbed for Washer/Dryer

✓ Electric Tanked Water Heater

✓ Electric Stove Ready & Vented for Above Range Microwave

Not Included:

✕ Washer/Dryer

✕ Dishwasher

✕ Fridge/Freezer

✕ Microwave

✕ Range

✕ Solar

Altadena ADU Turnkey Pricing Summary

Dedicated project concierge and an authorized channel contractor partner, handling the entire process from start to finish.

✓ What's Included in Turnkey Pricing

Project Management

  • Dedicated project concierge

  • Pre-development & Permit processing

  • Post development to obtain Certificate of Occupancy

Plans & Permits

  • CA State Pre-Approved Architectural & Structural Plan

  • California pre-approved local structural plan set

  • Permit Processing

  • Sales Tax of Unit(s)

Site Assessment

  • Site Topo Survey

  • Sewer inspection report to street connection

  • Prelim Title Report and easements review

  • Industrial Hygienist site testing report

  • Soils Compaction report

Foundation Work

  • Site work and foundations

  • Removal of stumps, roots, remnant footings

  • Grading / Remove / Recompact Soils

  • Engineering verification of foundations

  • Welding to foundation of unit(s)

Utilities Connection

  • New 100 amp electrical service panel

  • New water laterals to existing main

  • New sewer laterals to existing line

  • Onsite utilities laterals (sewer, electric, water)

  • Fire Sprinklers

Installation & Finishing

  • Delivery & installation

  • Transportation and Setting Prefab Unit(s)

  • Concrete Entry Stairs and Landing

  • Skirting at bottom of units

  • New Rain Gutters

  • Appliance installation labor only

  • Debris and trash hauling/cleanup

✕ What's NOT Included in Turnkey Pricing

Government Fees

  • Planning submission fees

  • Building permits

  • Sanitation, public works, fire fees

  • School tax, city/county clearance fees

  • Development fees, impact fees

  • Certificate of compliance fees

Appliances

  • Fridge/Freezer

  • Washer/Dryer

  • Range

  • Microwave

  • Dishwasher

Exterior & Landscaping

  • Fencing & Gates

  • Landscape & Irrigation

  • Drive Way

  • Sidewalk, Street Curb or Gutter Repair

  • Onsite Walk Paths

Water & Sewer

  • Sewer Line Upgrade outside property line

  • Water upgrade fees for service line

  • New water meters if required

  • Storm water requirements beyond gutters

Electrical Infrastructure

  • New Power Pole

  • New Transformer at Power Pole

  • String New Power Lines

  • Connection to Underground Power

  • Other electrical infrastructure upgrades

Other

  • Solar (not required for proposed units)

  • Setting prefab unit with crane

  • Internet provider charges

**Pricing depends on site location and conditions. Contact us for a detailed quote specific to your property. Authorized channel contractor partner’s are fully licensed in California with CSLB, insured and bonded.

Ready to Build Your Altadena ADU?

Contact our team today to discuss your project and get a personalized quote for your property.